22 kilometers starting from the breakwaters till the bridge "El Prieto"
There are 2 paralled breakwaters, measuring the one to the north 1,340 meters
and the south one 1,455 meters. Among them there is a distance of 330 meters;
in one side of the south one there is a jetty of about 165 meters long.
The depth of the navigation channel vary according to each terminal needs.
Zones | Depth |
From Km. o to Km. 9 (Metals and Minerals) | 10.20 Meters |
From Km. 9 to Km. 14 (Fiscal Precincts) | 10.20 Meters |
From Km. 14 to Km. 19 (Cementos Anahuac) | 8.50 Meters |
Containers, Mineral and Grains, Fluids Oil and Derived Products.